Scheduled promotion allowed to complete after package in baseline status



ID:    S143513
Published:    10 September 2021
Updated:    10 September 2021

Operating System(s)

  • Z/OS
 

Description

When you schedule a promotion to complete on a future date and the package is baselined before the scheduled promotion date is reached, the scheduled promotion is still allowed to complete even if the package is in ‘BAS’ status.

 

If you try to promote a package through the ZMF panels after it is baselined, you get the short error message ‘PROMOTE ERROR’ and the long error message:

 

 CMN1260A - Package must be in DEV, FRZ or REJ status. 

Applies To

ChangeMan ZMF 8.2 Patch 1, 8.2 Patch 5