Find Answers

Filter Search Results
All Operating Systems:
All Products:

All Solution Types:
Source:
 
Ask a Question
Example: "Database could not be verified"  
Tips | Start Over | Solutions | Alerts | Patches | Defects  
Pages [Next]
  Results
CMS-XML Calculated time/date filed throws exception error
SBM 2008 R2.02
CMS-XML Date and time data elements cannot be used in calculations or comparisons
SBM 2008 R2.02
CMS-XML You may get an incorrect result when calculate with date fields on reports
SBM 11.8
CMS-XML Report calculations not working with Date fields
SBM 11.8
CMS-XML "Set to Calculation" incorrect for date fields since upgrade to 11.1
SBM 11.1
CMS-XML Operator doesn't display or is cutoff when setting calculation on transition for Date and Numeric fields
SBM 11.0
CMS-XML Integer field in calculation on a transition causes error when Date/Time elapsed time is used.
SBM 10.1.5.3
CMS-XML Composer crashes if you try to set the Elapsed Time - Date/Time Field to a calculation without Field values
SBM 2008 R1.03
CMS-XML Analyzing Attachments for Business Mashups Upgrade in Oracle
Note: If you decide to move your attachments to the file system, it is recommended that you take your installation offline beforehand. If not, users may encounter issues because the process to extricate the files from the database to the file system takes time (though the setting is instantaneous). Performing the migration while the system is online causes attachment links to be invalid until after the file has been placed on the file system.
CMS-XML Incorrect overall deploy time calculation in the Activity Log
SBM
Pages [Next]

Welcome kb sso

My Recent Searches

Search Feedback

Are we answering your questions?

Additional Assistance

  • Submit a Case Online
  • FAQs