Find Answers

Filter Search Results
All Operating Systems:
All Products:

All Solution Types:
Source:
 
Ask a Question
Example: "Database could not be verified"  
Tips | Start Over | Solutions | Alerts | Patches | Defects  
Pages [Next]
  Results
CMS-XML Cannot set "Save Elapsed Time for Calculating State Changes" for any calendar
It is not possible to set " Save Elapsed Time for Calculating State Changes " in the App Admin If you create a new calendar, using the checkbox and Save, the checkbox setting is not inserted correctly into the ts_calendars record. It is not possible to set this for a calendar without backend db manipulation.
CMS-XML When clocks go back from daylight saving elapsed times calculations on transitions cause incorrect elasped time or transition failure with error : Calculation underflow error with operands ....
When clocks go back from daylight saving elapsed times calculations on transitions cause incorrect elasped time or transition failure with error : Calculation underflow error with operands ....
CMS-XML C++ API now binds the elapsed time field as double instead of int
Here are the critical lines of software: // Save the total seconds nTotalSeconds = sec min hour days;
CMS-XML Elapsed Time on Report Search Specification taking values incorrectly from input
Save the report and go back to modify it. Now shows as 150 00:00:00 or equivalent depending in format chosen.
CMS-XML Date/time field in Elapsed Time Format requires inconsistent value
When updating the item (not intending to change the date/time field), the date will continue to display as hh:mm in the elapsed time field, however, upon saving the update, an error is returned saying field is invalid. The date/time field must be changed to d hh:mm in order to save the update. After the update is saved, the value will once again revert back to display hh:mm.
CMS-XML Elapsed Time and Advanced Time in state reports show error message instead of No results if report is empty
2) Set search filter for report to return no results. 3) Preview or save and run report. Expected result:
CMS-XML How To: How to save the time and date of a build process in a macro name.
How To: How to save the time and date of a build process in a macro name.
CMS-XML Firefox: Timesheets appear to not save time from My Workspaces
Firefox: Timesheets appear to not save time from My Workspaces
CMS-XML ENH192505: Users can now choose to save report parameters or choose to be prompted every time reports are run (PPM 10.2.5)
ENH192505: Users can now choose to save report parameters or choose to be prompted every time reports are run (PPM 10.2.5)
CMS-XML Charts - Dimension and Period 'Period' not persisting properly
If you create a time -phased area chart, set period to ' Calendar Quarter', save it and open the properties again, the period is again the default not ' Calendar Quarter'.
Pages [Next]

Welcome kb sso

My Recent Searches

Search Feedback

Are we answering your questions?

Additional Assistance

  • Submit a Case Online
  • FAQs