Find Answers

Filter Search Results
All Operating Systems:
All Products:
All Solution Types:
Source:
 
Ask a Question
Example: "Database could not be verified"  
Tips | Start Over | Solutions | Alerts | Patches | Defects  
  Results
CMS-XML MCLG: MSSQL: Error ''Error changing password for the database owner. Error accessing project - possible wrong password supplied'' when attempting to change password for a project.
If the password for the database owner was changed via the SQL Server Enterprise Manager tool, then Collage will no longer be able to connect to the database. Collage will need to be synchronized so it can connect to the database. This is done by clicking the "Change Password" button on the Edit Project screen.
CMS-XML MCLG: How will the new USA 2007 Daylight Saving Time rules impact Collage?
This includes any operating system patches on both servers and the Java patch for Collage. If any of these are out of sync , you will see unexpected results. The date-time stamps that are controlled by the server include: asset last update, asset approved, check out/in, deploy start/end times, log timestamps (deploy, import, backup, Tomcat, audit log, etc), task transitions, deploy and task emails.
PDF User’s Guide for Collage Contributor
Button Description Navigation: Opens the Help Navigation Pane, which includes a Contents tab, an Index tab, and a Search tab. Show in Contents: Synchronizes the Contents pane with the topic you are currently viewing. Previous: Opens the previous topic, the topic above the current topic in the Contents pane.
PDF Serena Collage Project Manager's Guide
Incremental deployment allows you to automatically synchronize your destination servers with changes in your Collage project without having to re-deploy all assets, or manually choose only those files that you want to deploy. With incremental deploy, Collage:

Welcome kb sso

My Recent Searches

Search Feedback

Are we answering your questions?

Product Demos

Dimensions CM: Using multiple teams and multiple streams to perform parallel development (demonstration)
This demonstration shows you how to use multiple teams and multiple streams to perform parallel development in Dimensions CM.
Dimensions CM: A typical parallel development flow (animation)
This animation demonstrates a typical parallel development flow in Dimensions CM using multiple teams and multiple streams.

Additional Assistance

  • Submit a Case Online
  • FAQs