|
Results |
|
Disaster Recovery Keys for Mainframe Products
Disaster Recovery keys and temporary keys are available to customers with an active support contract. DR keys and temp keys for test purposes are limited to a maximum of 4 requests per year, and for no more than 3 days per request. If your requirements exceed these guidelines, please contact your sales representative.
|
|
|
Defects resolved in ChangeMan ZDD 8.2 Patch 5
OCTCR46A50002 Unable to set maximum upload size to 256 MB OCTCR46A51003
|
|
|
New Features in ChangeMan ZMF for Eclipse 8.1.4
The Data Set Allocation dialog permits you to specify PDSE V2 and MaxMemberGenerations Additionally, the dialog verifies the max generations against the max value that your installation has specified for this feature. PDSE V2 will be disabled
|
|
|
Potential userid regression if incorrect password entered once
The issue can be circumvented by switching to the Serena perspective after the initial failure, and logging on to the ZMF instance with the correct password. However, some users may already have re-tried the checkin expecting to be re-prompted for their password. This will have resulted in four failed logon attempts which will often exceed the installation defined maximum .
|
|
|
New Features in ChangeMan ZMF for Eclipse 8.2
<components warn=”50” max =”100” /> The <components> element is a direct child of the <options name=”CHECKOUT”> element, and applies globally, regardless of which profile is selected. There are two limits:
|
|
|