ECP query by install date returns incorrect results. Instead of returning packages with install dates between the dates entered, all packages prior to the TO dates are returned. The FROM date seems to be ignored.
When creating a package on a ZMF DP site, adding the same site multiple times is incorrectly allowed. The package cannot be frozen bcause the JCL build job fails.